BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Date iCal//NONSGML kigkonsult.se iCalcreator 2.20.6//
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:STANDARD
DTSTART:20261025T020000
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20270328T010000
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:calendar.11343.field_date_time_duration.0@legacy.techsoc.org.uk
DTSTAMP:20261110T054216Z
CREATED:20260807T125307Z
DESCRIPTION:Synopsis:\n\nThe Helsinki Metro is undergoing its most signific
 ant modernisation since the railway opened more than 40 years ago. Through
  the Metro Capacity and Reliability Improvement Programme (METKA)\, ageing
  train control\, communications and operational systems are being renewed 
 to improve reliability\, maintain safety and increase network capacity wit
 hout the need for new infrastructure. The programme aims to deliver a sust
 ainable 25% increase in capacity\, enabling more frequent services and sup
 porting the continuing growth of public transport across the Helsinki metr
 opolitan area.  In this presentation\, Heikki Viika\, Programme Director f
 or METKA\, will provide an overview of the programme\, including the strat
 egic drivers for modernisation\, the procurement and delivery approach\, k
 ey milestones achieved to date\, and the challenges associated with renewi
 ng critical railway systems while maintaining day-to-day metro operations.
  The session will also explore how the project is positioning the Helsinki
  Metro for the next generation of urban mobility.  Bart Thomas will then e
 xamine the technical aspects of the programme\, focusing on onboard system
  integration and the introduction of modern train control technologies. Th
 e presentation will discuss the integration challenges associated with upg
 rading existing and new rolling stock as well as a novel approach for fitt
 ing engineering vehicles.\nThe talk will provide a unique insight into how
  a major metro railway is being modernised through the careful integration
  of new technologies into an existing railway\, delivering increased capac
 ity\, improved reliability and a more sustainable transport system for the
  future.\n\n**********\n\nHeikki Viika is Programme Director of the Metro 
 Capacity and Reliability Improvement Programme (METKA) for Helsinki's metr
 o network. He is responsible for leading one of the largest rail modernisa
 tion programmes currently underway in Northern Europe\, overseeing the ren
 ewal of critical train control and communications systems that will increa
 se capacity and improve reliability across the Helsinki metropolitan area.
   Heikki has more than three decades of international experience in railwa
 y systems\, transportation technology and major infrastructure delivery. H
 is career has included senior leadership roles across the rail industry\, 
 including work on advanced signalling and train control programmes\, busin
 ess leadership within the railway supply sector\, and the delivery of comp
 lex transport projects across Europe and Asia. His experience spans railwa
 y modernisation\, programme management\, systems engineering and strategic
  transport development.\n \nBart Thomas is a Chartered Engineer and a rail
  systems and integration specialist with extensive experience delivering c
 omplex signalling\, communications\, control and rolling stock integration
  projects across metro\, mainline and urban transit networks.  Throughout 
 his career\, Bart has worked across all phases of the project lifecycle\, 
 from requirements development and systems engineering through to integrati
 on\, testing\, commissioning and operational handover. His experience incl
 udes the delivery of major railway modernisation programmes where legacy a
 ssets must be integrated with new digital signalling and control technolog
 ies while maintaining safe and reliable railway operations.
DTSTART;TZID=Europe/London:20261110T173000
DTEND;TZID=Europe/London:20261110T190000
LAST-MODIFIED:20261022T095421Z
LOCATION:10th Floor\, Palestra\, 197 Blackfriars Road\, SE1 8NJ
SUMMARY:TechSoc Talk: Helsinki Metro Capacity and Reliability Improvement P
 rogramme (METKA) - Heikki Viika\, Bart Thomas
URL;TYPE=URI:https://legacy.techsoc.org.uk/node/11343
END:VEVENT
END:VCALENDAR
